Use this post-inspection fire system checklist to review work completed by engineers after maintenance or testing. Confirm sign-in, presence of asbestos register and system logbook, verify zone plans and fire action notices, check call point signage and locations, sounder circuits, backup batteries and labelling, device placement and detection types, and whether recommendations and logbook entries are complete. Capture findings and signatures to document service quality and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
