This compressor change-out procedure checklist supports HVAC technicians during replacement jobs in facilities. It covers pre-install checks like part verification, unit data tag voltage, phasing, pipe sizing, and refrigerant type. Steps include flushing linesets, clearing restrictions, identifying failure causes, replacing the liquid line drier and contactor, pulling a vacuum below 500 microns, leak repair, and recording voltage, amperage, superheat, subcool, and coil temperature drop.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.