A practical maintenance checklist for calorifiers and heat exchangers used in building services. Covers quarterly, half yearly, and annual tasks: clean strainers, log hot water storage temperatures to 60 C, check and recalibrate thermostats and primary controls, verify valve and draincock operation, inspect manhole covers and connections for leaks, blow down to remove sediment, and record outlet temperatures on a rotating schedule. Annual activities include testing safety valves and thermostatic controls, inspecting mountings and insulation, draining and opening units for internal inspection, descaling, pressure testing coils, reinstating, recommissioning, and disinfecting in line with BS6700. Includes sections for warning notices, engineer comments, further works, and sign-off to document compliance and site handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
