Heat Exchanger Preventive Maintenance Checklist Semi-Annual
by Botha CG, from the Community
Use this semi-annual checklist to guide preventive maintenance for heat exchangers. It covers required tools, safety guidelines, lockout and tagout steps, and cleaning and inspection of strainers. Technicians are prompted to record maintenance hours, check for leaks after reassembly, and document results in the equipment history log. Follow manufacturer instructions and site safety rules.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
