Underground Electrical Bay Inspection Checklist
by Nyamjav Terbish, from the Community
Use this standard work instruction to guide 4-week, planned electrical inspections of underground load centers and switchgear. It covers pre-start isolation and hazard assessment, signage and clearance checks, grounding verification, equipment labeling and arc-flash requirements, housing and cable condition, distribution breaker and bus inspections, and switchgear cleanliness, damage, loose parts, moisture, and alarm history. Includes PPE requirements, CRM critical controls, and housekeeping. The workflow concludes with task completion, supervisor notification, and defect reporting. Estimated duration is approximately 2 hours.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.