Use this pre-build pad inspection template to assess access routes, drainage and culvert needs, slope angles, cut bank heights, erosion and sediment controls, and signs of subsurface water before earthworks. Evaluate ARD risk from road-building materials, confirm operator authorization and competence, and document deficiencies. Capture photos to the north, east, south, and west to record site conditions. Designed for mining exploration teams preparing drill pads and access roads.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
