Use this Lease Pad ERSED Inspection Checklist to assess erosion and sediment controls during oil and gas lease pad construction and rehabilitation. Verify ESCP approvals, topsoil stripping and stockpiling, clean and dirty water diversions, whoaboys, batter chutes with energy dissipators, outlet controls including coir logs and sediment traps, and soil amelioration. Capture measurements and application rates, document design changes, and confirm stabilisation, seeding, and final drainage to meet environmental compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
