Skip to content
SafetyCulture
Template

TS105.1 Hardware Inspection Runsheet (QA)

by Bruce Moon, from the Community

Downloads: 10+
Get this template

Use this TS105.1 Hardware Inspection Runsheet to complete a mandatory post-assembly quality check before units progress in production. Verify correct labelling, POS and camera mounting, pole and base fittings, grounding, cable clamps, NMI verification sticker, and power checks. Confirm printer setup, label roll, and safety covers. Capture faults, return to assembly for rectification, then recheck and mark as passed. Affix the Hardware QA Pass label and collect signature for audit.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.