Overhead Crane Pre-Start Inspection Checklist
by Callam Walker, from the Community
Use this overhead crane pre-start inspection checklist to ensure safe, compliant operations before every lift. Confirm controller identification and condition; check the hook for damage, safety catch function, correct MRC, and free rotation; look for kinks, frays, and proper reeving on ropes and sheaves; and operate all movements to verify correct direction, hoist limit switch, brakes, and emergency stop. Inspect below-the-hook gear including slings, chains, and attachments for cuts, nicks, stretched links, or heat damage, and remove any defective equipment immediately. This checklist supports manufacturing and warehouse teams in reducing risk and maintaining lifting equipment reliability.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
