Use this NYX Mold Build checklist to audit conformity with the NYX standard across tooling and process. Verify plaques, hydraulic and water connections, hot runner setup, vents and gating, ejection, slides and lifters, and part quality. Capture fill time, pressure, and balance, check Class A surfaces for flash, sink, splay, and mismatch, confirm engraving and demold, then document approval status before shipment.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
