Use this injection molding tryout report checklist to audit conformity to the NYX Mold Build Standard. Verify mold identification and safety plaques, hydraulic and water connections, hot runner setup, valve gates, locating ring, runner and gating design, and parting line vents. Assess process and mold performance including Moldflow validation, T1 protocol, TIS 3.1, cavity balance, parting line closure, class A surface quality, ejector, slides, lifters, and EOAT demolding. Record setup details and approve or flag readiness to ship to the NYX facility.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
