Use this injection molding tryout report checklist to audit conformity to the NYX Mold Build Standard. Verify mold identification and safety plaques, hydraulic and water connections, hot runner setup, valve gates, locating ring, runner and gating design, and parting line vents. Assess process and mold performance including Moldflow validation, T1 protocol, TIS 3.1, cavity balance, parting line closure, class A surface quality, ejector, slides, lifters, and EOAT demolding. Record setup details and approve or flag readiness to ship to the NYX facility.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
