Use this Final Inspection Report template to complete mechanical, electrical, and contract engineer checks before equipment dispatch. Verify parts and accessories against orders and drawings, confirm fasteners and pipework, validate isolators and labels, tighten connections, and record serial plates. Capture tests, software setup, flow control, and cable tray runs. Ensure CE marking requirements, remedial work completion, O and M manuals, and despatch documentation are in order. Add photos and sign-offs from mechanical and electrical supervisors and contract engineers to authorize final shipment and project closeout.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
