Skip to content
SafetyCulture
Template

Creamery Production Gemba Walk Checklist

by Tech ArlaFoods, from the Community

Downloads: 10+
Get this template

Use this creamery production gemba walk to evaluate safety, critical control points and calibration, chemical control and COSHH storage, paperwork accuracy, hygiene and fabrication, and 5S performance across dairy filling and end-of-line areas. Check X-ray machines and ATP swab calibration, verify warm fill and weight checks, confirm documentation is up to date, and ensure cleaning schedules, floors, drains, and equipment meet standards. Track SIC boards, stock levels, and radios. Designed for technicians to drive quality, food safety, and continuous improvement on dairy lines.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.