Creamery Gemba Walk Checklist for Technicians
by Mariusz Brodka, from the Community
This creamery gemba walk checklist helps technicians assess dairy production lines for safety, quality, and efficiency. Verify CCPs and X-ray performance, warm-fill documentation, chemical control (COSHH), and accurate paperwork. Inspect hygiene and fabrication standards across fillers, conveyors, floors, drains, and shadow-boarded tools. Confirm weight checks, foil tray labeling, and glass registers. Review Operator Asset Care for inkjet and Logopak systems, replenished label stocks, and spare coders. Ensure 5S compliance, SIC boards with actions, adequate ink and additive stock, and working radios. Use this template to drive consistent audits and continuous improvement in dairy processing.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
