Skip to content
SafetyCulture
Template

VX820 Install Sign Off Checklist

by IT Dev Team, from the Community

Downloads: 10+
Get this template

This installation sign off checklist guides technicians through upgrading from VX680 to VX820 payment terminals. Capture site details, PTID, serial and MAC addresses, record PED condition, and document deinstalled hardware. Map and label EPOS and PDQ switch ports, verify connections in the comms cabinet, and photograph data points, tills, and final setup. Complete end to end transaction and refund tests with receipt photos, note issues for follow up, and finish with engineer and manager sign off and handover details.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.