Skip to content
SafetyCulture
Template

P400/V240 PED Upgrade Sign Off

by IT Dev Team, from the Community

Downloads: 10+
Get this template

Use this P400/V240 sign off checklist to upgrade sites from VX820 or VX680 PEDs to the P400/V240. Record PTIDs, serial numbers and MAC addresses, capture photos of the old and new devices, verify 5GHz settings and the READY screen, and document end-to-end transaction and refund tests with receipts. Note issues, storage or collection of old PEDs, and obtain engineer and manager sign offs.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

P400/V240 PED Upgrade Sign Off Checklist & Handover | Free Template