Network Equipment Room Assessment Checklist 2025
by Daniel Mohs, from the Community
Use this Network Equipment Room Assessment 2025 checklist to evaluate the security, physical condition, and readiness of NER, PBX/UPS/FLS, and telecom rooms. Verify access control, door hardware, emergency signage, cooling and humidity ranges, fire detection and suppression, UPS status, and battery health. Confirm equipment stability, grounding and bonding, and cabling best practices. Capture wide-angle photos, update the NER drawing, and document any storage, media, or safety issues. Include serials and tags where applicable and escalate active leaks, alarms, or hazards. Designed for consistent, compliant site assessments with before-and-after evidence.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
