This nightly sign-off sheet supports LED refit teams working in The Range stores. Record site address, project start and estimated completion dates, and daily progress. Attach progress images with locations, log waste ready for collection, and document issues alongside any plant or materials required. Verify completion items including fixtures reinstalled, replacement fittings working, waste disposed correctly, materials and access equipment stored, and areas left clean and tidy. Capture store manager or supervisor sign-off with contractor signature to confirm handover for trading. Use this checklist to standardize nightly closeout, improve quality control, and maintain clear communication between contractors and store management.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
