Skip to content
SafetyCulture
Template

Currys LED Refit Nightly Sign Off Sheet

by Neil Kingston, from the Community

Downloads: 0
Get this template

This nightly sign off sheet supports Currys store LED refit projects. Use it to walk the work area with the store manager, document progress photos, note any issues, plan required plant or materials, and confirm completion tasks such as fixtures reinstated, replacement fittings operating, waste removed, equipment stored, and areas left clean and tidy. Capture signatures from the store representative and contractor to confirm a satisfactory handover for trading.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.