Skip to content
SafetyCulture
Template

Subway Post-Install Sign Off Checklist

by Jordan Bergin, from the Community

0
Get this template

Use this Subway post-install sign off to capture evidence and confirm a successful kiosk rollout. Record store details and photo the hardware before unpacking. In Front of House, count single-sided and wall-mounted kiosks, confirm Worldline terminals are secured, and upload photos of kiosks in position. Capture KDS 1-3 with stands and cable management, plus the Order Ready Screen. In Back of House, photo the comms cabinet and neatly labeled network cables. Complete end-to-end testing with card receipts, verify KMS flows, delivery orders on KDS, and loyalty QR scans. Log reopen timing, waste disposal, installer and franchisee feedback, outstanding issues to Vita Mojo, and obtain signatures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Subway Post-Install Sign Off Checklist for Kiosks and KDS | Free Template