Use this room project snag checklist to assess and sign off guest units before opening. Verify exterior condition, patio, doors and windows, lighting, floors, walls, ceilings, curtains, TV and sockets, desk and chair, minibar and fridge, AC settings, furnishings and bed, wardrobe and mirrors. In the bathroom, confirm ventilation, power sockets, hot and cold water, water pressure, drainage, fixtures, glass, and toilet flush. Record defects, track fixes, and deliver guest ready rooms.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
