Skip to content
SafetyCulture
Template

Upgrade LGK Site Inspection Report PFX and ICON Rev 2103

by Magnus Gustafsson, from the Community

Downloads: 10+
Get this template

Use this site inspection report to plan and verify upgrades of LGK systems to PFX or ICON in hospital settings. The checklist covers pre installation administration, access and offloading logistics, treatment room readiness, control room requirements, and treatment planning area checks. Validate radiation safety licensing and contacts, power and disconnects, HVAC and environmental ranges, network details, conduits and cabling, warning devices, and final sign offs to ensure a smooth installation.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .