Repair Solutions Stabilisation Report v5.1
by Independent Restoration, from the Community
This Repair Solutions stabilisation report template v5.1 guides restoration contractors through the first visit after flood, escape of water, or fire. Capture site details, building fabric, meter readings, and peril information; complete a thorough risk assessment including asbestos, electrics, and access considerations; and document area-by-area stabilisation work, moisture measurement plans, and equipment deployed. Record contents triage, action plans for buildings and contents, and coordination with adjusters and building consultants to progress insurance claims efficiently and reduce secondary damage.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
