Skip to content
SafetyCulture
Template

UE/Zinfra Prelim V1 Electrical Connection Checklist

by Brad Turner, from the Community

0
Get this template

Use this UE/Zinfra Prelim checklist to support preliminary assessments for new or altered electrical services. Capture REC and LEI details, site occupancy and supply status, metering requirements (single phase, multiphase, CT), meter quantities and locations, embedded network and basement metering considerations, and AMI conduit/comms requirements. Record service cable origin, size, phase, reticulation, pole and conductor lengths, installation status, and any equipment needed. Specify service fuse locations, types and sizes, and outline test-and-connect readiness including labelling, locks, and maximum demand. Identify crew requirements (service and metering, substation, underground, construction), access, EPV and traffic control, and whether re-prelim is required. Add servicing notes, defects, and photos to complete the pre-energisation review.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.