This electrical prelim checklist supports preparation for service connections and metering on construction and infrastructure sites. Capture site information, long-term access details, service cable specifications, fuse locations and sizes, SILV, SID and SCCD status, builder’s temporary supply, metering configurations including embedded networks and CT ratios, required fuses and meters, CoES details, and test and connection steps. Add photos, comments, and equipment needs for safe energisation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
