Streamline pre-installation assessments for residential or commercial solar projects with this Solar PV technical survey. Capture site details, current electrical conditions (service loop, meter, earthing and bonding, fuse board compliance, phase), and note any existing renewables. Document roof type and covering, mounting approach (in-roof or on-roof), array size and string layout, shading and required optimizers. Plan inverter and isolator locations, cable runs, distance to the consumer unit and expected voltage drop. Record battery storage preferences, on or off-grid configuration, building regulations implications, scaffolding needs, required parts, and customer requirements.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
