Skip to content
SafetyCulture
Template

Post-Installation Audit for FIR Replacement

by Bryce Milne, from the Community

Downloads: 0
Get this template

Use this post-installation audit to verify FIR replacement work on electrical switchboards. Record meter or NMI and HIRAC numbers, confirm customer contact before and after work, capture photos of the meter panel and FIR terminals, and ensure the switchboard is left in a non hazardous state. Check sealing of Essential Energy equipment, labels and file numbers, asbestos controls and decontamination, and correct FIR wiring and mounting with three bolts, noting justified exceptions.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .