Operational Point of Work Checklist

by Richard Fuller, from the Community

0
Get this template

Use this Operational Point of Work checklist to prepare and control activities at electrical substations. Record project and substation details, reference RAMS and methodologies, and confirm permits such as LOA, LSS, LV, and service clearance. Verify site setup, inductions, safety board, and work area segregation. Identify and segregate operational isolators and critical equipment, and capture CCR status and remote settings. Document supervisor, assessor, company, location, and date to ensure compliance and safe execution.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.