Skip to content
SafetyCulture
Template

Fluoride and PAC Dosing Stations Maintenance Report

by Bailey Duncan, from the Community

Downloads: 0
Get this template

This electrical maintenance report template is designed for fluoride and polyaluminium chloride (PAC) dosing stations at water treatment facilities such as Mt Kynoch. It guides technicians to test pump windings, insulation resistance, running loads, and phase voltages; inspect fuses, power leads, RCDs, and labeling; verify SCADA alarms, backup batteries, and communications; check flow and solenoid switches; and document completed work plus plan follow-up actions.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.