ECI Inspection for TRILITY MBG Water Treatment Plant
by Engineering Solutions, from the Community
Use this ECI site inspection template to assess electrical, control and instrumentation assets across the TRILITY Murray Bridge Water Treatment Plant. It includes TRILITY condition and criticality scales and references the SA Water electrical asset condition rating. Sections cover plant inlet and filtration, flocculation and sedimentation, UV disinfection, chemical dosing for alum, lime, caustic, fluoride and PAC, backwashing, pumping, treated water storage, and control building systems such as PLCs, SCADA, UPS and switchboards. Record start up year, condition, criticality, and note planned replacements for VSDs, pumps, analyzers and meters to prioritize maintenance and risk.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
