TRILITY Tailem Bend WTP ECI Site Inspection
by Engineering Solutions, from the Community
Use this ECI inspection template to assess the electrical, control and instrumentation systems at the TRILITY Tailem Bend Water Treatment Plant. The checklist references TRILITY condition and criticality scales and SA Water electrical asset ratings to guide consistent evaluations. Sections cover plant inlet, mixing and flocculation, sedimentation, filtration, UV disinfection, chemical dosing, relift and backwashing, treated water pumping and storage, control building systems and supernatant pumping. Capture startup year, condition, and criticality, and note planned refurbishments or end-of-life replacements.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
