Skip to content
SafetyCulture
Template

Solar PV and Inverter Site Survey Checklist

by Jeff Van Der Merwe, from the Community

Downloads: 0

This checklist guides pre-installation surveys for solar PV and inverter systems. Capture site details, access needs, electrical DB ratings, earth leakage status, generator specs and changeover options, inverter location and ventilation, WiFi readiness, AC and PV cabling routes, trenching needs, and roof data including structure, pitch, orientation, shading, and proposed array strings. Include photos, satellite images, and signatures. Optional CoC electrical works and extra services can be scoped for accurate quotes and safe, compliant installation.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.