Conduct a complete PV survey before installation. This checklist covers property and planning details, roof and loft condition, orientation and shading, available roof area and obstructions, proposed panel layout and output, inverter placement and DC isolation, AC isolation and generation meter location, cable routes, electrical board capacity and earthing, and scaffolding and access needs. Use it to verify feasibility, safety, and compliance for domestic or commercial solar projects.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
