Skip to content
SafetyCulture
Template

Commissioning Impressed Current CP Systems Audit

by Ashlea Gawne, from the Community

Downloads: 0

This audit protocol guides the commissioning of impressed current cathodic protection systems for buried or immersed assets. It covers pre switch on verification of connections and 240 volt supply, polarity confirmation to ensure the pipe is negative, loop resistance calculations, and setup of metered and unmetered cathodic protection units. It includes interference testing on secondary structures in line with AS 2832.1, documentation of final settings on form CPS2303-20A, and structured sign offs. Title, job, provider, crew, location, and date fields are included.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.