This audit protocol guides the installation and commissioning of impressed current cathodic protection (ICCP) systems. It covers identifying metered versus unmetered supply, correct CPU mounting, cabling requirements, and selection of horizontal or vertical anode ground beds. Steps include trenching, laying metallurgical coke breeze, placing and centering anodes, creating header cable loops and loop closures, making line-tap and epoxy-insulated connections, routing feeders via test points to the CPU, and inspecting cable insulation. It also covers vent pipe requirements, backfilling with warning tape, surface reinstatement, housekeeping, and safety checks including manual handling. Use this checklist to ensure complete, compliant ICCP installation and a safe work area.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
