Skip to content
SafetyCulture
Template

Impressed Current CP System Installation Audit

by Ashlea Gawne, from the Community

0
Get this template

This audit protocol supports field teams installing impressed current cathodic protection (ICCP) systems. It verifies correct CPU mounting, cabling requirements, trench preparation, laying metallurgical coke breeze, and placement of horizontal or bored anodes at specified centres. Steps include forming header and feeder cable loops, test point connections, epoxy-insulated loop joints, inspection of cable insulation, positioning PVC vent pipes, and securing cable tails. The checklist confirms backfilling with warning tape, surface reinstatement, adherence to manual handling practices, and leaving the work area in a safe state. Use it to ensure each stage is completed to specification and documented.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.