This audit protocol supports MG SWP CP6.002 for installing pipeline test points. It guides inspectors through key steps: confirming pipeline status, cutting and preparing cables, referencing drawings, installing earth rods or permanent references, assessing and installing sacrificial anodes (per MG SWP CP6.003), trenching and laying cables, mounting and securing test points, terminating cables, and completing site sketches and data sheets to document locations and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.