Installation of Test Points Audit Protocol

by Ashlea Gawne, from the Community

0
Get this template

This audit protocol supports MG SWP CP6.002 for installing pipeline test points. It guides inspectors through key steps: confirming pipeline status, cutting and preparing cables, referencing drawings, installing earth rods or permanent references, assessing and installing sacrificial anodes (per MG SWP CP6.003), trenching and laying cables, mounting and securing test points, terminating cables, and completing site sketches and data sheets to document locations and compliance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.