This checklist provides a structured audit protocol for MG AP CP3.028 to test zinc earthing beds. It guides crews through safety preparation, isolating halves of the earthing bed, installing temporary bond cables, disconnecting bridging links, measuring AC voltage and DC current, recording earthing bed resistance, and restoring connections. Use it to document results, verify both halves are tested, capture findings, and obtain auditor and crew leader sign off in line with MG SWP CP3.004.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.