This thermit welding audit protocol supports MG AP CP6.043 and SWP CP6.005 compliance. It guides auditors through work area preparation and permits, verifying safe distances from other welds, surface preparation and wall thickness checks. It covers cable preparation, mould positioning, charge loading and firing with required PPE. Post weld steps include inspection and remediation, cleanup, coating repair to MGN standards, and documenting location details. The template finishes with comments, findings, and auditor and crew leader sign offs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
