FAT Checklist for 66kV Switchgear in WTG

by pablo moreno, from the Community

0
Get this template

This factory acceptance test checklist supports commissioning of Siemens Energy 8VM1 66kV switchgear used in wind turbine generators for the East Anglia 3 project. It covers visual inspections, correct labeling and rating plates, earthing, cable compartments, and SIPROTEC mimic diagrams. Functional interface tests to the wind turbine controller include power supply at 230V AC and 110V DC, local and remote operations, circuit breaker commands, three position drives, gas alarms, trip signals, supervision, and auto reclose checks. Secondary injection tests for relays 7SR45 and 7SJ85 verify protection settings, inrush restraint, and earth fault functions. Primary injection confirms trip performance. Additional sections validate the fault passage indicator, voltage detection system, and mechanical and electrical interlocking against drawings.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

FAT 66kV Switchgear Checklist for WTG East Anglia 3 | Free Template