Verify readiness for water infrastructure works before construction. This preconstruction audit covers contractor qualifications, trench safety, traffic control, permits and road openings, setout survey and temporary benchmarks, current drawings and specifications, service and obstruction identification, live asset connection requirements, site management plans and SWMS, notifications to authorities, testing and survey scheduling, and documentation of adjoining properties.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.