Main Drain Preconstruction Audit Checklist
by James Sorraghan, from the Community
This Main Drain Preconstruction Audit template helps contractors and consultants prepare for drainage and civil works. It guides verification of qualified personnel and supervisors, Worksafe notifications, traffic control and public protection, material storage, temporary benchmarks, and setout survey. It covers securing road opening permits, having current drawings and specifications, identifying services and obstructions, and confirming existing connection levels. It prompts documentation such as JSA, SWMS, and toolbox talks, confined space entry forms, and required notices to consultants and authorities for inspections and surveys, including works within road reserves or private land. It reinforces access and connection requirements, photo records of adjoining properties, and managing variations through the superintendent.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
