Skip to content
SafetyCulture
Template

Road Preconstruction Audit Checklist

by James Sorraghan, from the Community

Downloads: 10+

This Road Preconstruction Audit checklist helps project teams confirm site readiness before roadwork begins. Verify qualifications, trench safety supervision, Worksafe notifications, traffic control plans, public protection, storage areas, and temporary benchmarks. Check setout surveys, road opening permits, current drawings and specifications, and identification of services and obstructions. Reinforce requirements for live service connections, capture condition photos of adjoining assets, and reference JSA, SWMS, and toolbox talks in the site management plan. Coordinate confined space and live asset connection forms, schedule testing and surveyor requirements with sufficient notice, and ensure superintendent inspections for soft subgrade. Manage deviations, variations, and work within road reserves or private land according to approved TMP and contract controls.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.