Work Inspection Sheet for Suspended Ceilings (V-WIS044)
by Olivia Philpotts, from the Community
Use this V-WIS044 work inspection sheet to verify suspended ceiling works from pre-start to handover. It covers RAMS approvals, coordination with other trades, services position and testing, fixing samples, specification compliance (tile modules, grid, hangers, fittings, finishes, insulation), fire stopping, M&E access, access panels, hanger adequacy, installation quality, protection, cleanliness, and final sign-off, with space for references and supporting documentation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
