Use this cable test checklist to plan and record electrical pre commissioning and pre energization tests on installed cables and switchboards. Capture project and location details, confirm site readiness, and verify crew sign on. Log test equipment make and model, serial numbers, and calibration due dates for insulation testers, multimeters, and clamp meters. Document cable endpoints, select test voltages, and record insulation resistance results between phases, phase to neutral, and phase to earth, with guidance that values should be at least 1 Mohm. Perform continuity checks with phases bonded to neutral at one end and verify results meet 0.5 ohm criteria. Include tester battery and lead checks and confirm compliance with AS3000 before energization.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.