Stormwater Field Inspection Report - Post Construction
by Dennis Good, from the Community
Use this CDOT Form 1177 checklist to complete post-construction stormwater inspections for CDOT projects. Capture project details, weather, SWMP updates, BMPs in place, and site stabilization. Assess erosion and sediment controls, document deficiencies, assign corrective actions, attach photos, and log completion dates. Verify no off-site pollutant discharges, record general notes, and certify compliance. Includes maintenance and compliance sign-offs for audit-ready reporting.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
