Skip to content
SafetyCulture
Template

Stormwater Field Inspection Report 7-Day

by Dennis Good, from the Community

Downloads: 0
Get this template

This stormwater field inspection report template, based on CDOT Form 1176, supports required 7-day inspections for active construction sites. It captures project details, weather, reasons for inspection, and SWMP management status. Inspectors assess current construction activities, review erosion and sediment control BMPs (e.g., silt fence, wattles, inlet protection, trackout control, check dams, seeding), document deficiencies, corrective actions, and preventative measures, and certify compliance. Sections also cover site discharge checks, general notes, and compliance certification by the SWMP administrator, superintendent, and CDOT designee.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.