Stormwater Field Inspection Report - Active Construction
by Dennis Good, from the Community
This CDOT Form 1176 based template supports 14-day stormwater inspections on active construction sites. It guides SWMP administrators and erosion control inspectors to document site conditions, BMP status, runoff events, and required corrective actions. Sections cover weather, construction activities, sediment and pollutant discharge checks, and compliance certification, with space for notes, photos, and signatures. Use it to maintain permit compliance and consistent reporting across projects.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
