Use this SMS 709 (A) Hop Up Permit & Inspection template to authorize and inspect 600x600 hop-up platforms on site. Record site details, subcontractor, operatives, and exact location. Confirm whether safer access alternatives are practical and document justification. Complete pre-use checks for wear, contamination, fittings, rivets, welding, hooks and catches, feet and caps, and hinges. Verify the platform is fit for use and that the Scafftag has been signed by a PASMA-trained person within the last 7 days. Attach the PASMA certificate and capture signatures for sign-off to maintain compliance and traceability at White City worksites.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
