Use this site pre-planner to assess a property before construction begins. Document site identification and photos, check boundary markers, fencing, kerbs and footpaths, and identify trees or debris. Verify availability and condition of utilities and services including power (overhead or underground), communications pits, water meter, gas, stormwater, and sewer, and confirm falls and connection points. Plan access, deliveries, parking, storage, toilets, skip bins, traffic control, and temporary builders power. Record requirements for retaining walls, barrier mesh, scaffolding protection, and site security. Includes a dedicated section for pool timing, fencing removals, conductive materials within 1200 mm, and earthing needs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
